The Cosmopolitan – Building Progress Report

Building PhotoEarly this week the 23rd of 28 floors was poured! And the windows are being installed on floor 11 as this post is being written. The crews have begun installing sheetrock on the 2nd and 3rd floors. You can watch the different patio elements being applied.

Showroom visitors have been excited about being able to see the glass on the building while traveling across the Fremont Bridge – also watching the different reflections on the glass as the sun moves throughout the day.

Visit the Cosmopolitan Showroom anytime. Open daily at 10th & Northrup; 10 to 5 M-F, 11 to 5 S/S; or call at 503-227-2000.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s